GN new developed a 2 function system for solids control and
drilling waste management. The configuration is really as below:
1 two mud tanks, one for solids control,
another frame for drill cuttings treatment, are both 40ft container and 20ft
container size
2 solids control mud tank including shale
shaker and desilter to split up the large solids collected in the
offshore drilling rig.
3 cuttings moving system: we offer screw
conveyor, cuttings collection hopper and Peristaltic pump to transfer the drill
cuttings (from onshore drilling solids control system and also the first solids
control tank) to vertical cuttings dryer.
4 drilling cuttings treatment system
including vertical cuttings dryer, shale shaker and decanter centrifuge, feeding pump for shale shaker and decanter
centrifuge, an entire skid to place these on the top for simple transportation.
5 frame of 20ft container size with thick
felt cloth round the frame to help keep warm in cold temperature.
6 necessary pipelines, pathway, hands
rails, man hole, cleaning gate and electric control system.
7 collection box for storage of cuttings,
liquids
This technique does apply for drilling
waste cuttings from both onshore and offshore, regardless of its treated by
solids control system before or otherwise. And you can use it for cold
temperature and temperature atmosphere.
The machine can as well be accustomed to
clean the drill cuttings gathered for lengthy year’s operation within the mud
pit/pool, but we have to analyze your oil based waste first of all by our
engineer team. Thanks for visiting connection with GN solids control sales to
obtain more particulars of the 2 function system and drawing.
When the drilling cuttings is collected
only from onshore solids control system, we'll only suggest the drilling
cuttings treatment system with vertical cuttings dryer and decanter centrifuge
on a single skid, this will be our traditional design. The benefit of this technique
is simple transportation, easy operation, and high end.
没有评论:
发表评论