The mud treatment is getting more and more
important in tunneling project, not dumping. While as limit space, big
capacity, the mud cleaning
system for tunneling project is always a problem, especially when it is for
the system used for the site.
2 sets 1500gpm mud system for domestic
client HDD project are ready for delivery. The client used for tunneling
project. 1500gpm mud system including below items: 1) 3 sets 500gpm
treating capacity shale shaker: GNZS703E-DZ, totally treating capacity 1500gpm
2) 1 set 1500gpm treating capacity mud cleaner: GNZJ703E-3S16N. 3) One mud recycling tank
with shale shaker & mud cleaner 4) One mud storage tank with mud agitator / mud
gun to storage / mix clean mud ready for use.
In China, tunneling mud was always no need
to handle very carefully, while all the cost including dumping, transportation,
and water, chemicals, personnels are getting higher. Then it is more resonable
to have the system to handle the drilling cutting mixture.
One of the important division for GN Solids
Control is the underground construction, our main business in this division
is HDD, horizontal directional drilling mud recycling and mud
mixing system, second is desanding equipment for bored pile foundation,
third is the slurry separation plant for the Micro-Tunneling.GN have the slurry
separation plant from120m³/h to even 1000 m³/h available. Either with single
mud tank system or multi-tank system for drilling mud separation and drilling
mud mixing.
Now GN can have all solutions for different
tunneling projects.
没有评论:
发表评论