Starting from solids control
equipment and system for oil and gas drilling, Hebei GN Solids Control Co., Ltd
has developed a complete line of product related to solids control in various
activities not only limited to the oil and gas drilling, such as horizontal
directional drilling, abbreviated as HDD, tunneling, geothermal drilling, water
well drilling and so on. As the top manufacturer in China, Hebei GN Solids Control Co., Ltd has been
leading the way in solids control for no dig projects with a international
brand GN Solids Control achieved. Until now, GN Solids Control has over 20 sets
mud recycling system work in Australia for HDD or CBM project. What’s more, GN
will attend 2015 AustraliaNo Dig Show around 1 month later, bringing its standard design of mud
recycling system with the capacity of 200GPM to this show.
GN mud recycling system is
composed with drill solids separation machines and mud mixing device, model
being divided by the treating capacity into G200, G350, G500, G1000. For small
treating capacity models, GN uses a double deck mini cleaner with the
combination of shale shaker and desilter cones on the top. The bottom deck
serves as the first phase treating machine to remove coarse solids thus
reducing the solid loading on the desilter cyclones and increasing the treating efficiency of
desilter cyclones. The desilter cyclones will separate finer solids out to make
the mud clean enough to return the active system after mixed. The treating
capacity depends on the quantity of the desilter cyclones. For large treating
capacity models, GN uses a shaleshaker as thefirst phase treating machine, and a desander or a desilter
as the second phase treating machine, then a desilter as the three phase
treating machine if needed.